SAP – DC Power Infrastructure

SAP – Donnelly Kerley Builders
SAP DC Power Infrastructure

Location: Palo Alto, CA
Design Duration: 6 months
Construction Duration: 7 months
Full Design – A, M, E, S, QC, LEED AP

Project Scope

ADC provided engineering design services for a complete operational Direct Current (DC) grid interconnected electric power system and Electric Vehicle Charging Stations for client, SAP.

Challenges

The challenge was to design an innovative and efficient system that utilized the DC power generated from SAP’s existing photovotalic array and channel into the energy needed to power racks in an existing Data Center and a new electric vehicle car charging station network for employees.

Solution

ADC’s team developed an innovative solution that addressed all project challenges and efficiently integrated a DC power system into the existing AC system as required and specified by the client.

Achievements

On time, on budget