Advance Design Consultants conducted a Facility Condition Assessment (FCA) of the 6 Oracle Office Buildings located in Redwood Shores including LEED assessment and certification. Following the FCA, ADC was awarded additional contracts for controls evaluations, equipment replacement, and additional assessment and consulting services.
Oracle Facility Conditions Assessment
by Ryan McBride