Portfolio

BD – Project Granite

Becton Dickinson (BD) Biosciences

12/11/2013-02/05/2014M,E,P, CM

Detailed Project Scope

BD Operates a manufacturing facility in San Jose, for its’ BD Biosciences operations. The facility is 35 years old, and was in need of a planned, programmatic upgrade to the overall facility. A preliminary study of the plant infrastructure was performed by ADC. ADC then partnered with Biggs Cardosa for structural engineering and DES Architects + Engineers for architecture services, to undertake “Project Granite”. The work is broken into 5 phases of A/E design phases.

The first phase conducted was a Master Plan, which included data collection, Site Survey and Interviews of key stakeholders, Test-Fit Development using IDEO concept of proposed spaces, and Basis of Design development and review with the GC/BD. The Design Effort was coordinated with all engineering disciplines.

The Second through Fourth Phases consisted of Tenant Improvement projects, ranging from the existing front office Area (approx. 130,000 SF), the Warehouse & Mezzanine Area (approx. 70,000 SF), to the Storage and Production Area (approx. 77,000 SF). For all three TI projects, ADC performed Mechanical, Electrical, Plumbing and Process Piping required to facilitate the Facility Condition Assessment (FCA) remediation requirements and support interior improvements developed by the Architect.

The fifth phase of the project was a Utility Chiller Plant, in which Mechanical, Electrical, Plumbing and Process Piping were required to facilitate the relocation of BD approved systems. Developed a complete PG&E package for a new thermal energy storage (TES) plant which provides up to 1,200 tons of nominal cooling (entire building load) and 6,230 ton-hrs. Of ice storage capacity. The project required the development of a bod report, feasibility study (required by PG&E) and whole building energy model using equest. The TES plant ice storage is designed to meet entire building cooling load during the PG&E peak hours (12pm-6pm) during the peak time of the year. This TES technology shifts electrical load by creating and storing ice or cold water during the morning or later evening hours, when energy rates are lower. During the afternoon hours when rates are higher, the building’s heating, ventilation and air conditioning (hvac) system uses this previously stored cold resource to reduce cooling costs and maintain comfortable facility temperatures. This plant received substantial rebates through PG&E which helped the economic feasibility of building this project. The rebate was only approved by PG&E by providing complete PG&E package, feasibility study and whole building energy model.

Copyrights ©2018 - Advanced Design Consultants, INC.

 

Update to our Clients & Partners:

ADC is taking the COVID-19 situation seriously to protect the health and well-being of our employees, clients and partners.

Advance Design Consultants, Inc. has implemented a Work from Home Plan (WFH) program to ensure our staff can comply with Santa Clara County's Shelter-In-Place order while still conducting business. Our main office in San Jose is currently physically closed, however our staff continues to support normal business operations initiating WFH program yesterday. ADC’s staff will continue to work with our clients, partners, consultants and community to provide business continuity of the same services that you have come to expect from us.We are committed to continue to provide the architectural-engineering design and calculations services, communication, and collaboration needed to keep our projects moving ahead on schedule. As we all work through this difficult period of time fighting this world pandemic together we will ensure to update you on our progress and deliverables.

During this time, please use email as this is the best way to reach us. Continue to reach out to your direct contact, and if you do not have a direct contact, use [email protected] and your message will be routed to the appropriate person.

We want to thank everyone for understanding that ADC will do our best to deliver our projects on schedule to best of our abilities while performing these task from home. If you have any questions, concerns, comments or even just need someone to talk to concerning a current or future project, do not hesitate to contact us. Together we can all ensure business continuity for our region and beyond.

 

Update to our Clients & Partners:

ADC is taking the COVID-19 situation seriously to protect the health and well-being of our employees, clients and partners.

Advance Design Consultants, Inc. has implemented a Work from Home Plan (WFH) program to ensure our staff can comply with Santa Clara County's Shelter-In-Place order while still conducting business. Our main office in San Jose is currently physically closed, however our staff continues to support normal business operations initiating WFH program yesterday. ADC’s staff will continue to work with our clients, partners, consultants and community to provide business continuity of the same services that you have come to expect from us.We are committed to continue to provide the architectural-engineering design and calculations services, communication, and collaboration needed to keep our projects moving ahead on schedule. As we all work through this difficult period of time fighting this world pandemic together we will ensure to update you on our progress and deliverables.

During this time, please use email as this is the best way to reach us. Continue to reach out to your direct contact, and if you do not have a direct contact, use [email protected] and your message will be routed to the appropriate person.

We want to thank everyone for understanding that ADC will do our best to deliver our projects on schedule to best of our abilities while performing these task from home. If you have any questions, concerns, comments or even just need someone to talk to concerning a current or future project, do not hesitate to contact us. Together we can all ensure business continuity for our region and beyond.